Amended swimming timetables for essential maintenance

Maintenance work is taking place at Brighouse and Sowerby Bridge swimming pools to ensure the best water quality for customers.

During the week beginning Monday 21 February, the sand filter system is being replaced at Brighouse and Sowerby Bridge pools. This will require the closure of the teaching pool from Monday 21 to Wednesday 23 at Brighouse and from Wednesday 23 to Friday 25 at Sowerby Bridge. This work is required every 7-10 years to ensure that the pool water remains clean and safe.

The main pool will remain open throughout as there are two filters on these pools which can be replaced at different times. However, due to the teaching pool being out of action, a revised timetable is in place at both sites whilst the work is taking place.

Users of both centres are encouraged to check timetables before their visit, as pool space will be limited, particularly in evenings as swimming lessons usually held in the teaching pool between 4pm and 7pm will be accommodated in the main pool – there will be no public swimming during this time.

The work has been scheduled for the half-term break when centres are usually quieter, and every effort has been taken to accommodate as many swimming sessions as possible.

Timetables will return to normal from week beginning Monday 28 February, following the half term break. From this date it will also no longer be necessary to pre-book lane swimming sessions.

For further information about the upcoming timetable changes, visit www.calderdale.gov.uk/sport.